Predictive Maintenance
Maintenance moves from reacting to data-driven decisions. Interventions are planned before damage occurs.
Only our system provides a complete overview of rail network condition — from a single source and from regular train operations.
Benefits
Innolyze is not another inspection tool — it is the continuous data layer on which maintenance and asset management can be reimagined.
Maintenance moves from reacting to data-driven decisions. Interventions are planned before damage occurs.
Fewer unplanned closures. Critical defects are detected earlier.
Every regular train increases measurement density. The network is mapped in finer detail with every journey.
APIs, webhook events and asset-management connectors.
What we detect
A single pass-by scan covers the full range of relevant inspection points — without a special run or manual track walking. Our current focus is on the rail head and track geometry. Sleepers and ballast follow in the next development stage. In the long term, the system will also capture the surroundings and inspect the clearance profile automatically during regular operation.
Rail
Track & ballast
Surroundings
Why Innolyze
Radar is the only sensing technology that keeps pace with the reality of European rail networks: tunnels, darkness, weather, vibration and vegetation.
Robust in rain, snow, fog, darkness and direct sunlight. It measures where cameras go blind.
Sensors travel on regular trains. Up-to-date data without track closures or specialist crews.
Geometry, surface and clearance profile as one connected volume.
One data foundation, one platform. From raw sensor values and reports to the maintenance software API.
Analytics platform
The Innolyze platform brings 3D models, condition assessments, recommendations and predictive-maintenance forecasts into one interface.
Automated rail infrastructure analysis

Grind rail head
km 12.180 – 12.240 (right)
Monitor sleeper position
km 12.150 – 12.250 (right)
Fastenings & geometry without findings
Remaining areas
Grind rail head
km 12.180 – 12.240 (right)
Within 30 days
Forecast based on current and historical data
Grind rail head
Within 30 days
€12,450
avoidable costs
€8,200
through timely action
Pilots & partnerships
We are looking for infrastructure operators, railway undertakings and OEMs as pilot and development partners. Talk to us about routes, data and joint trials.